HotpointFabricCare C HD 94M WBS UK 9KG Heat Pump Tumble Dryer with HomeWhiz - White
£499
Returns Policy
Non returnable under our Approval Guarantee, once installed or connected. Your statutory rights are not affected.
Find out more about our returns policies.Total price £499
Item number: WNCMP
E.A.N: 5 0 5 4 6 4 5 7 1 9 4 5 7Hotpoint FabricCare C HD 94M WBS UK 9KG Heat Pump Tumble Dryer with HomeWhiz - White
- Depth: 672 MM
- Dryer Type: Condenser
- Dry Load: 9Kg
- Energy Rating: A+++
- PetHairCare - Steam care for hair-free laundry.
- ColdGuard - Efficient drying, even in cold spaces.
- Heat Pump - Gentle on clothes, while saving up to 77% in energy *Compared to condenser tumble dryers of B energy class
- HomeWhiz - Manage your tumble dryer any time, anywhere.
- FastDry - Fast drying, gentle care
- Easy Clean filter - Effortless maintenance with our 2in1 filter.
- DelicateDry - Gentle drying for delicate clothes.
- Fold Flat Racks and Cutlery Basket: N
- Height: 846 MM
- Adjustable Basket Height: N
- Number of Programmes: 15
- Programmable Functions: Y
- Width: 598 MM
Customer reviews
Use the right and left arrows to scroll through the image carouselPage 1 of 322
Use the right and left arrows to scroll through the image carouselPage 1 of 322
Want to explore more like this?
View more from
Use the right and left arrows to scroll through the image carouselPage 1 of 322
Use the right and left arrows to scroll through the image carouselPage 1 of 322